settings_phone Обратный звонок
настраивается в лексиконах, настраивается в лексиконах
Режим работы:
настраивается в лексиконах
place Building A, 18th km of Moscow Highway, Samara city, Russia
access_time Work mode: from 8-00 to 17-00, sat-sun - day off
Language:

Our news

Tests of the SK-01 aircraft”
19.10.2020
Tests of the SK-01 aircraft”
Received a Certificate of airworthiness on the SAS «SK-01». Flight design tests of…
Read further

Cicada-M3 aircraft transferred to new owner
08.10.2020
Cicada-M3 aircraft transferred to new owner
After carrying out repair and restoration work, the aircraft “Cicada-M3 « (year of…
Read further

Flight  design tests of SK-01 airplane
18.05.2020
Flight design tests of SK-01 airplane
Flight amp; design tests of SK-01 airplane were carried out. This is the first plane…
Read further

Corvette 88
07.05.2020
Corvette 88
After pre-delivery inspection and additional improvements (adjustable damper installed…
Read further

MAKS 2019
18.09.2019
MAKS 2019
Silver Wings Ltd. took part in MAKS 2019 Air Show. The following airplanes were displayed…
Read further

Flight  design tests of SK-04 airplane
25.12.2018
Flight design tests of SK-04 airplane
Flight amp; design tests of SK-04 airplane have been completed (factory No. 02).Certain…
Read further

ARMY 2018
03.09.2018
ARMY 2018
Silver Wings Ltd. participated in International Military Technical Forum ARMY-2018. Corvette…
Read further

Repair of Corvette 54 amphibian airplane
27.03.2018
Repair of Corvette 54 amphibian airplane
Maintenance and preventive repair of Corvette 54 amphibian airplane (made in 2004)…
Read further

Set of wings for Cicada airplane
28.06.2017
Set of wings for Cicada airplane
Set of wings for Cicada 01 airplane is manufactured and ready for shipment. The plan…
Read further

Office phone number of Silver Wings Ltd. has been changed
12.05.2017
Office phone number of Silver Wings Ltd.…
Due to works at automatic telephone station, contact phone number of Silver Wings…
Read further

The installation batch of SA structural elements was made
28.03.2017
The installation batch of SA structural elements…
The equipment for manufacturing was developed and the installation batch of structural…
Read further

Repair of Elbrus plane
26.03.2017
Repair of Elbrus plane
Under strong request of the plane owner, and as there were no orders for repair of…
Read further